Engineering Change Orders
Search by:
Filter by:
Manufacturer
ECO | Manufacturer | Testing Lab | Impacted Device/System | Date Approved |
---|---|---|---|---|
MVT-137 | MicroVote General Corp. | Pro V&V | MicroVote EMS (All-In-One Voting Station booth) MicroVote EMS 4.0, 4.0B, 4.1, 4.2, 4.3-A, 4.4, and 4.41 systems |
03-30-2023 |
MVT-138 | MicroVote General Corp. | Pro V&V | Impacted Device: Dell Latitude 3520, Dell Latitude 3540 Impacted System: MicroVote EMS V4.41 |
11-22-2023 |
SW-7679 | Clear Ballot Group, Inc. | Pro V&V | ClearVote 1.5, 2.0 |
08-27-2020 |
SW7679 | Clear Ballot Group, Inc. | ClearVote 1.5, 2.0, and 2.1 (ClearDesign, ClearAccess, and ClearCount components |
08-27-2020 | |
UNS-1001 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Made changes to the following parts: 512 MB DDR Memory Module, 80 GB Hard Drive, and USB Flash Drive: DDR Memory Module andHard Drive wer added to the approved list because of being more readily available currently. Flash drive more ESD resistant case was added. |
05-17-2010 | |
UNS 1025 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Pro V&V | OpenElect 2.2 |
02-24-2022 |
UNS 1026 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Pro V&V | OpenElect 2.2 - Freedom Vote Scan |
02-24-2022 |
UNS 1027 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Pro V&V | OpenElect Freedom Vote Scan |
07-26-2022 |
UNS-1028 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Pro V&V | FVS OpenElect 2.2 OpenElect 2.2.3 |
07-06-2023 |
UNS 1029 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Pro V&V | FreedomVote Scan (FVS) using OpenElect 2.2 and 2.2.3 |
07-20-2023 |
UNS 1030 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Pro V&V | FreedomVote Scan with OpenElect 2.2. and 2.3 |
09-26-2023 |
UNS-16842 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Removed "EAC APPROVED" and moved "UNISYN" logo to center on OVO and OVI label. |
05-24-2010 | |
UNS-16844 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Make changes to BOM and riase Rev. from A to B. The replacement motherboard had been granted a CE Declaration of Conformity for testing that was comparable to that required by the EAC 2005 VVSG. |
08-22-2011 | |
UNS-16847 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Updated AC distribution cable |
05-24-2010 | |
UNS-16855 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Printer, Star TSP743II-24, Serial Interface, Gray, OVI - new flash ROM supplier forced a change to the mainboard and a change to the firmware. |
11-30-2010 | |
UNS-16856 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | OVI label change |
11-30-2010 | |
UNS-16857 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Network seal, plate printer mount, bottom chassis, bracket lock/seal cover, hinge chassis - to alleviate interferences and to accomplish an overall better intercomponent fit and easy of assembly. |
11-30-2010 | |
UNS-16858 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Changes in labels for TM and USB flash drive - revision made to documentation for ease of tracking. |
11-30-2010 | |
UNS-16859 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | OVI ADA Keypad - wrong base material called out on ADA keypad (Part Number 8063-93018). |
11-30-2010 | |
UNS-16865 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Add missing EAC label - the BOM for the affected units are missing the EAC label. |
08-26-2011 | |
UNS-16869 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Change in motherboard - 2.0GHz motherboard for OVO PC no longer available. Decision made to use the same motherboard for OVO and OVI PC's. |
05-18-2012 | |
UNS-16870 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Changes were made to various documents/part numbers due to multiple reasons such as: scanner mounting plate hole mismatch, clearance RJ45 connector too small, hinge pins not sufficiently secured, and clearances too small. |
09-29-2011 | |
UNS-16871 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Deleted spacers and changed BOM - the four spacers under the motherboard wer eliminated; therefore, the BOM had to be changed and the assembly drawing revised. |
09-29-2011 | |
UNS-16979 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Pro V&V | OVS 2.0.A (Freedom Vote Tablet) |
07-05-2018 |
UNS-17012 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Pro V&V | Open Elect Voting Optical (OVO) Ballet Box |
10-29-2019 |
UNS 17050 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Pro V&V | OpenElect Voting Optical (OVO) 2.2 |
05-17-2022 |
UNS 17059 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Pro V&V | Freedom Vote Scan |
07-13-2022 |
UNS-17110 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Pro V&V | OpenElect OVO 2.1 |
08-19-2020 |
UNS-17111 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Pro V&V | OpenElect Tabulator Manager module, version 2.1 |
08-19-2020 |
UNS-17112 | Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) | Pro V&V | OpenElect Ballot Layout Manager Module, version 2.1 |
08-19-2020 |